In House Testing has just commenced for the MAK Industrial Water Solutions Woodside Goodwin Alpha (A) Platform RO Plant. This RO Plant includes a
BHP Yandi Booster Pump Station
In House Development work is underway for the Hydarmet BHP Booster Pump Station Water Treatment Plant at the Spinifex Yandi site. An Allen-Bradley CompactLogix
CRS Anglocoal MBR Plant
In House Development works has commenced on a packaged sewage pump station (STP) and 71kL Waste Water Treatment Plant (WWTP) to be installed at
Wallumbilla Potable WTP
CRS have recently commissioned KAPP Engineering to develop a control system for a PWTP in Wallumbilla. The primary objective of the Wallumbilla PWTP is
Hydramet Tambellup WTP
KAPP Engineering commences work on the Tambellup Water Treatment Plant Control System for Hydramet. The Control System software supplied is similar to a previous
Rio Tinto WADB Borefield
Advanced Pump Technologies have contracted KAPP Engineering to provide Logic Design, Programming, In House Testing, Witnessed Testing and Commissioning works for the Rio Tinto
Golden Hills Gold Processing Plant
KAPP Engineering has been commissioned to develop a process control system for the Bayan Airag – Golden Hills Gold & Silver Processing Plant in
Barrow Island Additional WWTP
CRS have recently contracted KAPP Engineering to provide Control System Design, Programming and In House Testing works for a new 1500 Person Waste Water