Engineering works has commenced on the Wyndham Leisure and Events Precinct Aquatic Centre in Melbourne (West). The control system utilises multiple Koyo PLCs and
RAAF East Sale WTP
KAPP Engineering has just commenced work on the RAAF East Sale Bore Water Treatment Plant. The control system utilises an Allen-Bradley CompactLogix PLC with
Wodgina RO Plant Integration
CitectSCADA modifications have just commenced for the Global Advanced Metals Wodgina Mine Site. The modifications include the integration of the existing RO Plant on
Rio Tinto WADB Borefield FAT
KAPP Engineering has successfully completed Witnessed FAT for the Phase 1 Borefield for Rio Tinto’s West Angelas Deposit B Project. The system was comprehensively
MAK Kazakhstan WTP
Logic design has commenced for the containerised Water Treatment Plant (WTP) for MAK Industrial Water for a Copper Project in Kazakhstan. The WTP will
North Butler Hydrotherapy Pool
Work has commenced on the Commercial Aquatics Australia Hydrotherapy Pool Control System for the North Butler Primary School in WA. The pool control system
Holiday Operating Hours
The KAPP Engineering Office will be closed from the 21st of December 2013 to the 5th of January 2014. Normal hours will resume as
Automation Fair 2013
KAPP Engineering’s Praveen Paul and Dimantha Jayasinghe have just returned from Rockwell Automation’s premier technical event “Automation Fair” held at Houston, Texas, United States.