As part of our Quality Management system, every control system designed and supplied by KAPP Engineering is fully tested in-house to ensure that it meets the design criteria. This typically involves setting up the complete control system hardware and software in our office, complete with an array of digital and analog devices to simulate all field devices and external components. All tests are fully documented via detailed test records. Naturally, we encourage our customers to witness the final stages of the FAT to verify that all requirements are met and that they are 110% happy with the results.