Preliminary design works has commenced for the MAK RO Plants for both the Port Landside and Rail Terminal Reverse Osmosis Plants which will be
May, 2014 (2)
MAK Brackish Water RO
Logic design has commenced for a high pressure brackish water RO for MAK Water. The control system for the RO Plant includes a Schneider