December, 2013 (8)

Holiday Operating Hours

The KAPP Engineering Office will be closed from the 21st of December 2013 to the 5th of January 2014. Normal hours will resume as

Read More

Automation Fair 2013

KAPP Engineering’s Praveen Paul and Dimantha Jayasinghe have just returned from Rockwell Automation’s premier technical event “Automation Fair” held at Houston, Texas, United States.

Read More

Woodside Goodwyn Alpha RO Plant

In House Testing has just commenced for the MAK Industrial Water Solutions Woodside Goodwin Alpha (A) Platform RO Plant. This RO Plant includes a

Read More

BHP Yandi Booster Pump Station

In House Development work is underway for the Hydarmet BHP Booster Pump Station Water Treatment Plant at the Spinifex Yandi site. An Allen-Bradley CompactLogix

Read More

CRS Anglocoal MBR Plant

In House Development works has commenced on a packaged sewage pump station (STP) and 71kL Waste Water Treatment Plant (WWTP) to be installed at

Read More

Wallumbilla Potable WTP

CRS have recently commissioned KAPP Engineering to develop a control system for a PWTP in Wallumbilla. The primary objective of the Wallumbilla PWTP is

Read More

Hydramet Tambellup WTP

KAPP Engineering commences work on the Tambellup Water Treatment Plant Control System for Hydramet. The Control System software supplied is similar to a previous

Read More

Rio Tinto WADB Borefield

Advanced Pump Technologies have contracted KAPP Engineering to provide Logic Design, Programming, In House Testing, Witnessed Testing and Commissioning works for the Rio Tinto

Read More