Preliminary design has commenced on the Water Corporation’s Design and Construction of the Sodium Hypochlorite Plant Upgrades for Independent Artesian Bores at Leederville, Melville and Balcatta located within the Perth Metro. As a member of the Water Corporations Process Control System Panel (PCS Panel) KAPP Engineering was successful in securing all control system works for this project for the EPC – Guidera O’ Connor (GOC).

All documentation, design and programming works would be to Water Corporation Standards and involves Koyo PLCs, GE QuickPanel OIP’s, SCADAPack RTU’s and modifications to the Operations Centre ClearSCADA (SCX6) and ABB MicroSCADA SCADA systems.