Engineering has commenced on upgrades for the Water Corporation Harding Dam Water Treatment Plant for Watercon. The scope involves the additional of new monitoring
Perth Mint Retractable Roof
KAPP has recently successfully commissioning a turnkey control system incorporating a PLC based control system to open and close the maintenance roof at the
Vector Roy Hill Drop Table
KAPP has completed works on a Rail Drop Table for clients Vector Lifting for the Roy Hill Project. The control system utilises a Allen-Bradley
BHP Area C 17 x Trailers
KAPP has completed design, development and witnessed testing for 17 x trailer mounted headworks packages for BHP Mining Area C. Programming was performed on
Westral IFC Machine
KAPP has commenced work on an Insulated Fire resistance Cable (IFC) machine for Westral Insulated Products. The control system utilises a Koyo PLC and
NSW State Parks WTPs
KAPP has commenced work on 3 x Water Treatment Plants for CRS Industrial Water Treatment for Water Treatment Plants at Burrendong, Mookerawa and Glenbawn
West Angelas Borefield Phase 2
Witnessed testing is presently underway for two additional headworks (bores) trailers built by UON for Phase 2 of the West Angelas Deposit B (WADB)
Chameleon Washdown Facility
KAPP Engineering has completed in-house development works for the Iconic Water designed and engineered Washdown Treatment Plant for Chameleon Resources. The control system utilises